1/24/2021 0 Comments Atlas Copco Power Focus Pdf
At the250 Maxtime for rst tighten- This information is shown and the job ing run out (job) is usually terminated if the rst tightening is not really carried out within the speci.This sophisticated fastening program is made up of: a Energy Focus control.To display function F1 press F once, to screen functionality F2 press F twice etc.It can become con gured to display information from any Power Focus within a mobile.
The screen is fully con gurable - the picture below shows only one instance. Job zero. Your Computer should identify the PF, which can make it feasible to start TTPF and connect to the PF making use of the serial choice. The rundown can be the rotation before snug level (where the mess head begins compressing the joint). A problem restaurant could bene t from a change of strategy, or it can become redesigned into smal- ler proportions and lower weight, while getting together with the same clamping needs. Power Focus has a rehit recognition centered on device acceleration in the rst phase, and tightening up position in the. If you click your method past Components in the PF Map, then IO coach, after that right-click on Con guration, you will be directed through the neces- sary tips by the system. Right now there, you can e.h. Device deal with the unit is arranged. There is certainly no more time a want to open up the Item to check the rotary change. Alternative: Create a Logic Con gurator that regulates the referred to process. The example displays that the output signal of our Reasoning Disadvantage gurator linen is known as Logic Relay 1. We provide the key push signal the name Reasoning digin 1, see below. You might not really be very delighted with the outcome. Why 1. The Job OK indication can be a lengthy internal signal, staying energetic until the following Job is certainly activated. The Alright signal is already a 0,1 s long heart beat, and would not really need the conversion with the help of a Timer gate. The place must be recognized in range with local safety regulations. It will need one insight to trigger the canister and two advices to deactivate it (one for the key switch and one for Work Fine). With this LoCo, we just wish to induce the Job, using the Work piece xtured transmission. Create a third LoCo, that utilizes the key switch sign as input (like LoCo 1 above) to abort the Job. For even more information notice section Sub information for event codes. E132 Incorrect tool begin insight 1) Examine if the remote start wiring in settingt the PF is certainly correctly established in accordance to the settings in the Scam. Elizabeth153 Not Ok to choose A job is presently operating, it is usually not really pos- new work sible to choose a brand-new work until the.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |